Permitting Coordination
Permit packages, submissions, and agency responses, coordinated where the project requires them.

Scope
Scope
[01]What it covers
Preparation and submission of permit packages, follow-up through review, and responses to agency comments and revisions, as your jurisdiction and scope require.
[02]How it's decided
Early review of which parts of the design are likely to need approval, based on the property, the jurisdiction, and the project scope.
[03]What you receive
Regular updates on where the process stands and what each step means for the schedule, with approved requirements carried into construction.
Overview
Many projects include elements that need approval before they can be built. Retaining walls, pools, structures, and grading work often fall into this category. Where required, we coordinate the permitting your project needs, working with the appropriate agencies and licensed professionals. We do not issue permits ourselves; we manage the process so it stays connected to the design.
How we approach it
We identify early which parts of the design are likely to need approval, so they can be planned for rather than discovered late. When the engineering and drawings are ready, we help assemble and submit the permit package, follow the review, and address comments as they come back. Throughout, we keep you informed about where things stand and what each step means for the project.
Part of the whole property
Permitting connects the design to construction. The retaining walls that hold a hillside terrace, the structure of a pool, and the footings of a pavilion often depend on it. Because one team coordinates design, engineering, permitting, and the build, the conditions that come out of this stage are carried directly into the work on site.